扫描二维码关注我为好友

NewsAbout Us

Home >News

1 dry hanging method

Draw lines on the wall.

II wall embedded parts are weldable corner, keel, keel, fitted with metal pendant; do not have embedded parts can use chemical anchor bolt installation of the main keel, then install the keel, with metal Guajian installed artificial sandstone.

Finally seal the gap.

2 direct installation method

(2m is usually very low.

The mixing with adhesive, glue on the back of the artificial sandstone using tooth paste spatula, artificial sand rock in the line on the wall.

II from the following the first installation, drying, beautify the gap.